What affects timeline
Project scope is the biggest factor — installing a single flower bed is very different from a full landscape renovation or a hardscape build involving excavation and base preparation.
Weather and site conditions
Rain, extreme heat, and site access can all affect scheduling. We build realistic timelines that account for these factors.
Getting a timeline for your project
We provide an expected timeframe as part of your proposal, based on the specific scope of your project.
